No | Name of Project & Location | Main Contractor | Priod | Type Of Roof/Siding & Volume | Remark |
---|---|---|---|---|---|
1 | Iseki New Factory Pier - Pasuruan | PT. INDONAKANO | April 2013 | Eagle-ZIP 420 Al-Zinc = 22.000 m2 Eagle Trim PP Al-Zinc = 2.000 m2 | Roll on Site |
2 | Seiren New Fa ctory JABABEKA VI - Cikarang | PT. INDONAKANO | May 2013 | Eagle-Zip 420 Al-Zinc = 15.000 m2 Eagle Trim PP Al-Zinc = 2.000 m2 | Roll on Site |
3 | Fusoh Tube Parts Indonesia JABABEKA VI - Cikarang | PT. Polygon Perkasa Indonesia | April 2013 | Eagle-Zip 428 Al-Zinc = 3.500 m2 Eagle Trim PP Al-Zinc= 800 m' | Roll on Site |
4 | KTB New Sparepart Center MM2100 - Cibitung, Bekasi | PT. SMCC Utama Indonesia | August 2013 | Eagle-Zip 428 Al-Zinc = 32.000 m2 Eagle Trim PP Al-Zinc = 8.000 m2 | Roll on Site |
5 | Yamakin Indonesia MM2100 - Cibitung, Bekasi | PT. KADI International | July 2013 | Eagle-Zip 428 Al-Zinc = 3.500 m2 Eagle Trim PP Al-Zinc = 1.400 m2 | - |
6 | Sankyu Logisti c Center Deltamas - Cikarang | PT. SMCC Utama Indonesia | June 2013 | Eagle-Zip 428 Al-Zinc = 17 .000 m2 Eagle Trim PP Al-Zinc= 6.000 m2 | Roll on Site |
7 | Brite Polymer JABABEKA I - Cikarang | PT. Prima Engineering Constru ction | July 2013 | Eagle Rib PP Al-Zinc = 5.000 m2 Eagle Trim PP Al-Zinc = 2.000 m2 | - |
8 | TS-T ech BIC - Cikampek | PT. SMCC Utama Indonesia | October 2013 | Eagle-Zip 428 Al-Zinc = 6.500 m2 Eagle Trim PP Al-Zinc = 500 m2 | Roll on Site |
9 | Tigar 50 TPD Pupuk Kujang - Cikampek | PT. SMCC Utama Indonesia | September 2013 | Eagle-Zip 428 PP Al-Zinc = 2.100 m2 Eagle Trim PP Al-Zinc = 3.100 m2 | Roll on Site |
10 | YEMI Factory II Extension PIER - Pasuruan | PT. INDONAKANO | November 2013 | Eagle-Zip 420 Al-Zinc = 1.300 m2 Eagle Trim PP Al-Zinc = 1.600 m2 | Roll on Site |
11 | YMPI Factory II PIER - Pasuruan | PT. INDONAKANO | November 2013 | Eagle-Zip 420 Al-Zinc = 5.000 m2 Eagle Trim PP Al-Zinc= 1.100 m2 | Roll on Site |
12 | SUDO Manufacturing MM2100 - Cibilung, Bekasi | PT. INDONAKANO | January 2014 | Eagle-Zip 428 Al-Zinc = 3. 700 m2 Eagle Trim PP Al-Zinc = 1.600 m2 | Roll on Site |
13 | Jfe Shoji Steel Indonesia MM2100 - Cikarang, Bekasi | PT. KADI International | February 2014 | Eagle Trim PP Al-Zinc= 4.500 m2 | - |
14 | Boltz Indonesia KIIC - Ka raw a ng | PT. INDONAKANO | March 2014 | Eagle-Zip 428 Al-Zinc = 5.100 m2 Eagle Trim PP Al-Zinc = 2.400 m2 | Roll on Site |
15 | Su ca co Serang - Balaraja Baral | PT. Hanada Eka Perkasa | March 2014 | Eagle-Zip 428 Al-Zinc = 8.400 m2 Eagle Trim PP Al-Zinc = 1.300 m2 | - |
16 | Ito chu Logisti c Corp. Surya Cipta - Karawang | PT. INDONAKANO | June 2014 | Eagle-Zip 428 Al-Zinc = 9.700 m2 Eagle Trim PP Al-Zinc = 4.700 m2 | Roll on Site |
17 | Dowa Thermotech Indonesia Kl IC - Karawang Ba rat | PT. INDONAKANO | June 2014 | Eagle-Zip 428 Al-Zinc = 4.000 m2 Eagle Trim PP Al-Zinc = 1.500 m2 | Roll on Site |
18 | Taiyo Tosin Indonesia MM2100 - Cikarang | PT. KADI International | July 2014 | Eagle-Zip 428 Al-Zinc = 1.500 m2 Eagle Trim PP Al-Zinc = 500 m2 | - |
19 | Hisada Indonesia MM2100 - Cibitung | PT. KADI International | October 2014 | Eagle Trim PP Al-Zinc= 2.300 m2 | - |
20 | Nippon Konpo (Extension) KIM - Karawang | PT. PP-Taisei Indonesia | February 2015 | Eagle-Zip 420 Al-Zinc = 7 .000 m2 | Roll on Site |
21 | Kanefusa Indonesia Delta Sili con - Cikarang | PT. INDONAKANO | March 2015 | Eagle-Zip 428 Al-Zinc= 5.000 m2 Eagle Trim PP Al-Zinc= 500 m2 | Roll on Site |
22 | NEX Logisti c Indonesia Deltamas - Cikarang | PT. SMCC Utama Indonesia | March 2015 | Eagle-Zip 428 Al-Zinc= 15.500 m2 Eagle Trim PP Al-Zinc = 5.800 m2 | Roll on Site |
23 | Nippon Konpo Indonesia Kota Bukit lndah - Cikampek | PT. PP-Taisei Indonesia | March 2015 | Eagle-Zip 420 Al-Zinc = 11.000 m2 Eagle Trim PP Al-Zinc = 3.300 m2 | Roll on Site |
24 | Sankyu (Phase II) Deltamas - Cikarang | PT. SMCC Utama Indonesia | May 2015 | Eagle-Zip 428 Al-Zinc= 20.000 m2 Eagle Trim PP Al-Zinc = 9.300 m2 | Roll on Site |
25 | Nittsu Shoji KIM - Karawang | PT. SMCC Utama Indonesia | May 2015 | Eagle-Zip 420 Al-Zinc= 30.000 m2 Eagle Trim PP Al-Zinc = 9.200 m2 | Roll on Site |
26 | Meiji Rubber Indonesia Deltamas - Cikarang | PT. INDONAKANO | May 2015 | Eagle-Zip 420 Al-Zinc= 30.000 m2 Eagle Trim PP Al-Zinc = 9.200 m2 | Roll on Site |
27 | Hankyu Hanshin Logistics MM2100 - Cibitung | PT. INDONAKANO | May 2015 | Eagle-Zip 750 Al-Zinc= 10.200 m2 Eagle Trim PP Al-Zinc= 1.500 m2 | Roll on Site |
28 | Ajinomoto Coal Boiler Mojokerto - East Java | PT. INDONAKANO | June 2015 | Eagle-Zip 750 Al-Zinc = 6.000 m2 Eagle Trim PP Al-Zinc = 3.000 m2 | Roll on Site |
29 | Tsuzuki Asama (Extension) KIIC - Karawang | PT. INDONAKANO | October 2015 | Eagle Clip 600-BL Al-Zinc = 7.000 m2 | Roll on Site |
30 | Toyo Denso (Phase Ill) MM2100 - Cibitung | PT. SMCC Utama Indonesia | December 2015 | Eagle-Zip 750 Al-Zinc = 3.500 m2 Eagle Trim PP Al-Zinc = 500 m2 | Roll on Site |
31 | Tenma Indonesia Surya Cipta - Karawang | PT. SMCC Utama Indonesia | February 2015 | Eagle-Zip 750 Al-Zinc = 25.000 m2 Eagle Trim PP Al-Zinc= 5.000 m2 | Roll on Site |
32 | PPLI Maintenance Cileungsi - Boger | PT. INDONAKANO | February 2015 | Eagle-Zip 750 Al-Zinc = 4.000 m2 Eagle Trim PP Al-Zinc = 2.200 m2 | Roll on Site |
33 | JFE Shoji Steel (Extension) MM2100 - Cibitung | PT. INDONAKANO | March 2016 | Eagle Clip 600-BL AZinc = 3.000 m2 Eagle Trim PP Al-Zinc = 2.000 m2 | Roll on Site |
34 | Hoyu Indonesia KIIC - Karawang | PT. SMCC Utama Indonesia | June 2016 | Eagle-Zip 750 Al-Zinc = 12.000 m2 Eagle Trim PP Al-Zinc= 1.800 m2 | Roll on Site |
35 | Denso Indonesia (Plant 3) MM2100 - Cikarang | PT. PP-Taisei Indonesia | August 2016 | Eagle-Zip 750 Al-Zinc = 12.000 m2 Eagle Trim PP Al-Zinc = 3.800 m2 | Roll on Site |
36 | Sajiku Ajinomoto KIIC - Karawang | PT. PP-Taisei Indonesia | December 2016 | Eagle-Zip 750 Al-Zinc = 6.000 m2 Eagle Trim PP Al-Zinc= 2.200 m2 | Roll on Site |
37 | Maxxis Build. 105 -108 Deltamas - Cikarang | PT. SMCC Utama Indonesia | December 2016 | Eagle-Zip 420 PP Al-Zinc = 36.000 m2 Eagle Trim PP Al-Zinc = 60.000 m2 | Roll on Site |
38 | Nissin Foods Indonesia Jababeka - Cikarang | PT. SMCC Utama Indonesia | April 2017 | Eagle-Zip 750 Al-Zinc = 7.000 m2 | Roll on Site |
39 | E-0 Sajiku Indonesia KIIC - Karawang | PT. PP-Taisei Indonesia | April 2017 | Eagle-Zip 750 Al-Zinc = 6.700 m2 Eagle Trim PP Al-Zinc= 2.000 m2 | Roll on Site |
40 | Sakura Java (Extension) EJIP - Cikarang | PT. INDONAKANO | September 2017 | Eagle-Zip 750 Al-Zinc = 4.500 m2 Eagle Trim PP Al-Zinc= 800 m2 | Roll on Site |
41 | Itochu Logistic Suryacipta - Karawang | PT. INDONAKANO | October 2017 | Eagle-Zip 428 Al-Zinc = 8.000 m2 Eagle Trim PP Al-Zinc= 4.000 m2 | Roll on Site |
42 | Hiruta Kogyo (Extension) KIIC - Karawang | PT. INDONAKANO | December 2017 | Eagle-Zip 750 Al-Zinc = 2.000 m2 Eagle Trim PP Al-Zinc= 1.000 m2 | Roll on Site |
43 | Ajinomoto Re-Building Printing Mojokerto - East Java | PT. INDONAKANO | December 2017 | Eagle-Zip 750 Al-Zinc = 3.000 m2 Eagle Trim PP Al-Zinc = 500 m2 | Roll on Site |
44 | Yamada 2nd Factory Extension MM2100 - Cibitung | PT. INDONAKANO | February 2018 | Eagle-Zip 750 Al-Zinc = 5.000 m2 | Roll on Site |
45 | lseki Factory Extension PIER - Pasuruan | PT. INDONAKANO | March 2018 | Eagle-Zip 420 Al-Zinc = 8.000 m2 Eagle Trim PP Al-Zinc = 1.000 m2 | Roll on Site |
46 | Schutz New Factory KIIC - Karawang | PT. INDONAKANO | July 2018 | Eagle-Zip 750 PP Al-Zinc= 8.500 m2 Eagle Trim PP Al-Zinc = 18.000 m2 | Roll on Site |
47 | Nex Log isti cs Indonesi a GIIC - Cikarang | PT. SMCC Utama Indonesia | July 2018 | Eagle-Zip 750 Al-Zinc = 46.200 m2 Eagle Trim PP Al-Zinc= 10.800 m2 | Roll on Site |
48 | lnoac PU Factory Karawang - West Java | PT. INDONAKANO | September 2018 | Eagle-Zip 750 Al-Zinc = 3.500 m2 Eagle Trim PP Al-Zinc= 2.800 m2 | Roll on Site |
49 | Nutrindo Joga Shima Delta Mas - Cikarang Denso 3 Expansi on WH MM2100 - Cikarang | PT. Taisei- Pulauintan Construction Internati onal | October 2018 | Eagle-Zip 750 Al-Zinc = 3.000 m2 Eagle Trim PP Al-Zinc= 2.000 m2 | Roll on Site |
50 | Denso 3 Expansi on WH MM2100 - Cikarang | PT. Taisei- Pulauintan Construction Internati onal | November 2018 | Eagle-Zip 750 Al-Zinc = 7.500 m2 Eagle Trim PP Al-Zinc= 2.000 m2 | Roll on Site |
51 | Kao Indonesia Jababeka - Cikarang | PT. Eskon Bangun Lestari | December 2018 | Eagle Clip 600-BL Al-Zinc = 2.000 m2 Eagle Trim Al-Zinc : 1.200 m2 | Roll on Site |
52 | ITSA Factory Expansi on KIIC - Karawang | PT. INDONAKANO | January 2019 | Eagle Clip 600-BL Al-Zinc = 7.000 m2 Eagle Trim PP Al-Zinc = 5.000 m2 | Roll on Site |
53 | SMII Finished Goods Pulogadung - Jakarta | PT. INDONAKANO | May 2019 | Eagle-Zip 750 Al-Zinc : 3.500 m2 Eagle Trim PP Al-Zinc = 3.000 m2 | - |
54 | HATTORY Factory Renovation Majalaya - Bandung | PT. KADI Internati onal | June 2019 | Eagle-Zip 750 Al-Zinc = 6.700 m2 Eagle Trim PP Al-Zinc = 2.700 m2 | Roll on Site |
55 | Asahimas Chemical Cilegon - Banten | PT. SMCC Utama Indonesia | July 2019 | Eagle-Zip 750 Al-Zinc = 2.200 m2 Eagle Trim PP Al-Zinc = 1.500 m1 | Roll on Site |
56 | PPLI PCB Treatment Facilities Cileungsi - Bogor | PT. INDONAKANO | July 2019 | Eagle-Zip 750 PP Al-Zinc = 2.600 m2 Eagle Trim PP Al-Zinc = 1.800 m2 | - |
57 | RKN Forge Factory Extension KIM - Karawang | PT. INDONAKANO | August 2019 | Eagle-Zip 750 Al-Zinc = 3.500 m2 Eagle Trim PP Al-Zinc = 1.500 m2 | Roll on Site |
58 | Hon Chuan Third Warehouse Ngoro - Mojokerto | PT. INDONAKANO | August 2019 | Eagle-Zip 750 PP Al-Zinc= 16.000 m2 Eagle Trim PP Al-Zinc = 5.100 m2 | Roll on Site |
59 | Takai Seiki Extension MM2100 - Cikarang | PT. INDONAKANO | September 2019 | Eagle Clip 600-BL Al-Zinc = 1.200 m2 Eagle Trim PP Al-Zinc = 1.000 m2 | Roll on Site |
60 | Sakae Riken Extensi on Surya Cipta - Karawang | PT. Taisei- Pulauintan Construction Internati onal | September 2019 | Eagle-Zip 420 Al-Zinc = 11.200 m2 Eagle Trim PP Al-Zinc = 5.400 m2 | Roll on Site |
61 | Sumiden Serasi Wire Product Ci teureup - Bogor | PT. SMCC Utama Indonesi a | October 2019 | Eagle-Zip 750 Al-Zinc = 5.300 m2 Eagle Trim PP Al-Zinc = 4.000 m2 | Roll on Site |
62 | Oriental Asahi JP Carton Box MM2100 - Cikarang | PT. INDONAKANO | October 2019 | Eagle Clip 600-BL Al-Zinc= 35.500 m2 Eagle Trim PP Al-Zinc = 9.200 m2 | Roll on Site |
63 | Asahi Denso Extension MM2100 - Cikarang | PT. INDONAKANO | November 2019 | Eagle Clip 600-BL Al-Zinc= 5.200 m2 Eagle Trim PP Al-Zinc = 2.000 m2 | Roll on Site |
64 | Theodore Pan Brothers Jati hurip - Tasikmalaya | PT. MET A EPSI | January 2020 | Eagle-Zip 750 Al-Zinc = 20.000 m2 | Roll on Site |
65 | lnoac Polytechno Indonesia Cikupa Mas - Tangerang | PT. Shimi zu Bangun Cipta | October 2020 | Eagle-Zip 420 Al-Zinc = 19.000 m2 Eagle Trim Al-Zinc = 9.000 m2 | Roll on Site |
66 | Nissin Food Indonesia JABABEKA - Cikarang | PT. INDONAKANO | November 2020 | Eagle-Zip 750 Al-Zinc = 4.500 m2 Eagle Trim PP Al-Zinc = 4.500 m2 | Roll on Site |
67 | TSP New Factory Phase-2 GIIC · Cikarang | PT. INDONAKANO | November 2020 | Eagle-Zip 750 Al-Zinc = 7.500 m2 Eagle Trim PP Al-Zinc = 4.000 m2 | Roll on Site |
68 | Sukanda Djaya Cold Storage Malang • East Java | PT. INDONAKANO | January 2021 | Eagle-Zip 750 Al-Zinc = 5.000 m2 Eagle Trim Al-Zinc = 5.000 m2 | Roll on Site |
69 | Heinz ABC Soy Extract Karawang · West Java | PT. INDONAKANO | March 2021 | Eagle-Zip 750 Al-Zinc = 7.000 m2 Eagle Trim Al-Zinc = 5.000 m2 | Roll on Site |
70 | TUV Nord New Laboratory Cikarang - West Java | PT. INDONAKANO | May 2021 | Eagle Clip 669 Al-Zinc = 2.000 m2 | Roll on Site |
71 | Global Kimia Delta Mas - Cikarang | PT. Global Kimia Manufaktur Mandiri | July 2021 | Eagle-Zip 750 Al-Zinc = 6.000 m2 Eagle Trim PP Al-Zinc = 7.500 m2 | Roll on Site |
72 | MBI Roof Replacement Batuceper - Tangerang | PT. INDONAKANO | August 2021 | Eagle Clip 669 Al-Zinc= 12.500 m2 | Roll on Site |
73 | Muramoto Elektronika Indonesia EJIP · Cikarang | PT. Taisei- Pulauintan Construction International | August 2021 | Eagle Trim PP Al-Zinc = 3.500 m2 | Roll on Site |
74 | Asian Isuzu Casting Center KIIC - Karawang | PT. Polygon Perkasa lndonusa | October 2021 | Eagle Clip 600-BL Al-Zinc= 7.000 m'2 | Roll on Site |
75 | STEP Factory Phase-3 Jababeka - Bekasi | PT. INDONAKANO | November 2021 | Eagle-Zip 750 Al-Zinc = 7.200 m2 Eagle Trim PP Al-Zinc = 3.800 m2 | Roll on Site |
76 | ISEKI Warehouse Expansion PIER - Pasuruan | PT. INDONAKANO | April 2022 | Eagle-Zip 420 Al-Zinc = 11.000 m2 Eagle Trim PP Al-Zinc = 1.500 m2 | Roll on Site |
77 | Tunas Alfin Factory Cikande - Banten | PT. Tunas Alfin Tbk. | April 2022 | Eagle-Zip 750 Al-Zinc = 23.000 m2 Eagle Trim PP Al-Zinc = 7.000 m2 | Roll on Site |
78 | SEID New Factory KIIC - Karawang | PT. INDONAKANO | June 2022 | Eagle-Zip 420 Al-Zinc = 43.000 m2 Eagle Trim PP Al-Zinc= 15.000 m2 | Roll on Site |
79 | ESR-2 KITIC Delta Mas - Cikarang | PT. INDONAKANO | June 2022 | Eagle-Zip 750 Al-Zinc = 40.000 m2 Eagle Trim PP Al-Zinc= 15.000 m2 | Roll on Site |
80 | Senopati Bekasi - West Java | PT. Polygon Perkasa lndonusa | July 2022 | Eagle-Zip 750 Al-Zinc = 9.000 m2 | Roll on Site |
81 | kawai Plant-2 Factory Extension lndotaisei - Cikampek | PT. Taisei-Pulauintan Construction International | August 2022 | Eagle-Zip 750 Al-Zinc = 3.500 m2 Eagle Trim PP Al-Zinc= 2.500 m2 | Roll on Site |
82 | LG Electronics R&D Center MM 2100 - Cibitung | PT. Kumgang Hyundai Indonesia | September 2022 | Eagle Clip 600-BL Al-Zinc= 10.000 m2 Eagle Trim Al-Zinc = 10.000 m2 | Roll on Site |